Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 61 - 90 of 6879

Full-Text Articles in Physical Sciences and Mathematics

Re: Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty Jul 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) 2024 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Mike Mcanulty Jul 2024

Re: Butte Priority Soils Operable Unit (Bpsou) 2024 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential – Interior School Dust) - Gold Hill Lutheran Church (Creativity Factory Preschool) (Dated April 8, 2024), Molly Roby Jul 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential – Interior School Dust) - Gold Hill Lutheran Church (Creativity Factory Preschool) (Dated April 8, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) – Silver Bow Montessori (Dated April 25, 2024), Molly Roby Jul 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) – Silver Bow Montessori (Dated April 25, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Dust) – Kennedy Elementary (Dated April 17, 2024), Molly Roby Jul 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Dust) – Kennedy Elementary (Dated April 17, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels - Indoor Dust) – Small World Daycare (Dated April 17, 2024), Molly Roby Jul 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels - Indoor Dust) – Small World Daycare (Dated April 17, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Effects Of Simulated Climate Change On Native Southeastern Grassland Vegetation Using Open Top Chambers, Makaila Carpenter Jul 2024

Effects Of Simulated Climate Change On Native Southeastern Grassland Vegetation Using Open Top Chambers, Makaila Carpenter

Theses

The southeastern United States is a critical biodiversity hotspot once covered in prairie grassland ecosystems and now facing significant threats due to urbanization, habitat destruction, over-exploitation, biological invasions, pollution, and climate change. This study analyzes the response of Alabama’s native prairie ecosystem to climate change. We used open top chambers (OTCs) to simulate climate change-induced warming. We assessed the response of ecosystem function and structure to higher temperatures (1-3oC). The indicators of ecosystem function included phenology, leaf surface area (LSA), specific leaf area (SLA), and aboveground and below net primary productivity (ANPP and BNPP respectively). Ecosystem structure was …


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc. Jul 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Mike Mcanulty Jul 2024

Final 2024 Residential Metals Abatement Program (Rmap) Mandan Park Soil Remedial Action Work Plan (Rawp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2024

Draft Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Mike Mcanulty Jul 2024

Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #13 [Copper Mountain Park], Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2024 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc. Jul 2024

Revised Draft Final 2024 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) Annual Update (Non-Residential Parcels And Residential Daycares), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Spatio-Temporal Analysis Of The Roadside Transportation-Related Air Quality (Startraq 2022): Data-Driven Exposure Analysis By Transportation Modes, Jaymin Kwon, Yushin Ahn, Steve Chung Jul 2024

Spatio-Temporal Analysis Of The Roadside Transportation-Related Air Quality (Startraq 2022): Data-Driven Exposure Analysis By Transportation Modes, Jaymin Kwon, Yushin Ahn, Steve Chung

Mineta Transportation Institute

Particulate matter (PM) pollution poses significant health risks, influenced by various meteorological factors and seasonal variations. This study investigates the impact of temperature and other meteorological variables on PM10 and PM2.5 levels in Fresno County, known for high air pollution. Multiple linear regression (MLR) and generalized additive models (GAMs) assess the significance of these relationships. Analyzing data from Fresno County, we examine PM10 and PM2.5 levels across "hot" (June to August) and "cool" (September to May) seasons. Findings indicate PM10, both MLR and GAM models identify statistically significant variables, excluding temperature and wind direction in each season. However, during the …


Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium], Pioneer Technical Services, Inc. Jul 2024

Final 2024 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment/Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) For Bres No. 121 – Travona Dump, Bres No. 125 – Child Harold-2 Dump, Bres No. 34e – Eveline Dump East, Bres No. 45 – Garfield, Bres No. 49 – Old Glory, Bres No. 52 – Moscow, Bres No. 74 – West Gagnon Dump, And Bres No. 78 Original Mine (Dated May 7, 2024), Molly Roby Jun 2024

Comment/Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) For Bres No. 121 – Travona Dump, Bres No. 125 – Child Harold-2 Dump, Bres No. 34e – Eveline Dump East, Bres No. 45 – Garfield, Bres No. 49 – Old Glory, Bres No. 52 – Moscow, Bres No. 74 – West Gagnon Dump, And Bres No. 78 Original Mine (Dated May 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024), Molly Roby Jun 2024

Comments For The 2024 Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Quality Assurance Project Plan (Qapp) For Non-Residential Parcels And Residential Daycares (Dated May 23, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Mandan Park Soil Rawp (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium] (Dated May 10, 2024), Molly Roby Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #14 [Silver Bow Homes Park, Butte Koa, Fairmont Rv Park, And Cccs Gymnasium] (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval For The Response To Comments Letter (Dated May 21, 2024) For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans (Caps) For Reclaimed Sites (Dated January 31, 2024), Molly Roby Jun 2024

Re: Approval For The Response To Comments Letter (Dated May 21, 2024) For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans (Caps) For Reclaimed Sites (Dated January 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024), Emma Rott Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023 (Dated March 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #13 [Copper Mountain Park] (Dated May 10, 2024), Molly Roby Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program Park Soil Sampling Field Sampling Plan Submittal #13 [Copper Mountain Park] (Dated May 10, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty Jun 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Jun 2024

Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby Jun 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated June 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2024

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott Jun 2024

Re: Approval Of The Draft Final Silver Bow Creek Conservation Area Repository And Haul Route Quality Assurance Project Plan (Qapp) (Dated June 10, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott Jun 2024

Re: Comments On The 2024 Draft Final Butte Priority Soils Operable Unit (Bpsou) Interim Site- Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp) (Dated November 29, 2023), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby Jun 2024

Re: Approval Of The Butte Priority Soils Operable Unit Residential Metals Abatement Program Yard Submittals (Dated April 24, 2024) And Draft Rmap Remedial Action Work Plan (Dated May 7, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Jun 2024

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby Jun 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Uncontrolled Surface Flow Areas Remedial Design (Rd) Work Plan, Draft Bpsou Uncontrolled Surface Flow Areas Pre-Design Investigation (Pdi) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp) [Dated January 25, 2024], Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.